Utilization Permission (UP)
View Procedure
Procedure Name | Utilization Permission (UP) |
Description | Utilization Permission (UP)
Category : Permit
|
Renewal Frequency of the Permit : Fresh issuance for each valid utilization declaration
|
Issuing Ministry : National Board of Revenue
|
Issuing Authority/Incumbent Office:
|
Address:
Customs Bond Commissionerate
342/1, Segunbagicha, Dhaka-1000
www.cbc.gov.bd
Email. bondcomdhk@gmail.com
Fax: +880-2-9341076
Tel: 88-02-9347000
|
Required Documents
Serial
|
Documents Titles
|
Remarks
|
|
Back to Back Letter of Credit/Sales Contract/Import Permit
|
Alternatively, Sales contract or Import Permit can also serve the purpose
|
|
Proforma Invoice
|
By the authorized agent of the foreign manufacturers/suppliers
|
|
Utilization Declaration
|
|
|
Master LC
|
Opened by the Banks
|
Process Steps
Step 1
|
Bonder comes with required documents and duly fills-in UP Application From and submits the papers to the CBC Data Entry Kiosk
|
Step 2
|
Data are entered into the Bond Management Information System (BMIS) and a physical file consisting of the required documents and UP application form
|
Step 3
|
Application is assigned to an Assistant Revenue Officer (ARO) automatically by the BMIS and the respective physical file is sent to the ARO by Desk Clark
|
Step 4
|
ARO checks the application in online and verifies the physical documents
|
Step 5
|
ARO sends the application to Revenue Officer (RO) through the BMIS
|
Step 6
|
RO checks the application online and, if required, the physical documents
|
Step 7
|
ARO send the application to Assistant Commissioner (AC) or the Deputy Commissioner (DC) of CBC office
|
Step 8
|
If the value of UP remains less than USD 80,000 then the AC or the DC approves the application. If UP’s value is more than 80,000 then the AC or DC send the file to the Joint Commissioner or Additional Commissioner (ADC)
|
Step 9
|
UP and note sheet are printed in the CBC data entry kiosk and put inside the physical file
|
Step 10
|
UP is dispatched to the respective bonder
|
Official Time Limit: 1-2 days
License Fee: No fee is required
Process Map
|
Category | National Board of Revenue (NBR) |
The following form/s are used in this procedure
This procedure applies to the following measures
Name | Measure Type | Agency | Description | Comments | Legal Document | Validity To | Measure Class |
No results found. |